  • Blue-green runs two full environments and switches traffic at once
  • Blue-green gives very fast rollback by switching back
  • Canary sends a small share of traffic to the new version first
  • Canary limits the blast radius and compares metrics between versions
  • Cost and complexity trade-offs, including database compatibility

Model answer

In a blue-green deployment I run two complete environments. Blue serves users while green gets the new version and is tested; then I switch all traffic to green at the router. Rollback is instant because I just switch back, but it needs double capacity during the release and every user moves at once. In a canary deployment I send a small share of real traffic, say 1 to 5 percent, to the new version and compare its error rate and latency with the old one. If it looks healthy I increase the share in steps; if not, only a few users were affected. I choose canary for most services with enough traffic to compare, and blue-green when I need an all-or-nothing switch or when traffic is too low for a canary to show anything. Both need backward-compatible database changes.