medium10 pts · first answer countsci-cddora-metrics
Computing change failure rate
Last month the team made 40 production deployments. 6 of them caused an incident or needed a rollback or hotfix. What is the DORA change failure rate?
Discussion 0
Join free to post in the discussion.
Related questions
- CI vs Continuous DeliveryDevOps Engineer
- What set -euo pipefail doesDevOps Engineer
- Where GitHub Actions workflows liveDevOps Engineer
- GitLab CI stagesDevOps Engineer
- Why keep a Jenkinsfile in the repoDevOps Engineer
- Parking unfinished changesDevOps Engineer
- Copying one fix to a release branchDevOps Engineer
- Version bump for a breaking changeDevOps Engineer