medium10 pts · first answer countsslosmitigationchange-management
Roll back or roll forward?
A config change caused errors. A fix-forward patch would take 40 minutes to build and test. Rolling back takes 3 minutes. What is usually best?
Discussion 0
Join free to post in the discussion.
Related questions
- What is an SLO?Site Reliability Engineer
- Error budget for 99.9%Site Reliability Engineer
- Downtime allowed by 99.99%Site Reliability Engineer
- Writing an SLI as a ratioSite Reliability Engineer
- SLO stricter than the SLASite Reliability Engineer
- Why not aim for 100%?Site Reliability Engineer
- Error budget in requestsSite Reliability Engineer
- A good latency SLISite Reliability Engineer